Geotechnical Settlement Analysis
Calculate immediate, consolidation, and secondary settlement for foundations
Immediate Settlement
Consolidation Settlement
Secondary Compression
Foundation Parameters
Soil Properties
Immediate Settlement Calculation
Immediate settlement occurs instantly after load application in all soil types. It’s calculated using elastic theory:
Si = (q × B × I × (1-ν²)) / E
Where: q = applied pressure, B = foundation width, I = influence factor, ν = Poisson’s ratio, E = Elastic modulus
Settlement Results
Total Settlement
0 mm
Calculation Steps:
1. Contact pressure: q = 1000 kN / (2.0 m × 2.0 m) = 250 kPa
2. Elastic settlement: Si = (250 × 2.0 × 0.82 × (1-0.3²)) / 50 = 7.48 mm
Settlement Risk Assessment
Low Risk
Moderate Risk
High Risk
Low Risk
- 0-25 mm: Low risk – acceptable for most structures
- 25-50 mm: Moderate risk – may require special design
- 50+ mm: High risk – requires mitigation measures